lcz
服务流程
服务流程/Service Process
1
Preliminary discussion
初步洽谈
○  介绍中成嘉泰酒店设计团队

Introduce the design team of Zhongchengjiatai

○  介绍产品,流程及各个阶段交付文本

Introduction of the work,delivery text of flow and each stage

○  请携带原平面图,便于初步交流及设计方向

Please carry the original plane graph, which is convenient for the preliminary communication and design direction

2
Sign a contract
签订合同
○  确定各阶段支付设计成果,达成鉴定合同

Make sure the delivery and design result of each stage and finally sign a contract

○  在两个工作日内支付首付款

Pay the initial payment within two work days

○  前期对该项目做可行性分析

Feasibility analysis will be carried out in the early stage.

3
Study of conceptual design of plane planning
研究平面规划概念设计
研究平面规划概念设计
4
Project Design
方案设计

nfa


——全套方案完成/Completion of the whole project


5
Construction Drawing Design
施工图设计
图纸说明 平面图 白皮书
6
Delivery Confirmation of Construction Drawing
施工图交付确认
○  业主、施工员、酒店硬装、软装设计师、施工配合人员各执一份图纸

Owner, construction staff, hotel hard installation, soft decoration designer, construction cooperation personnel each hold one drawing

○  酒店硬装主要材质白皮书交付确认

Hotel hard installed main material white paper delivery confirmation

○  酒店软装家具、配饰、艺术品清单交付、确认

Hotel soft decoration furniture, accessories, art list delivery, confirmation

7
Construction Drawing Guidance
施工图指导
○  酒店软装设计师进行图纸交底,指导施工员施工

The hotel designer will disclose the drawings and guide the construction staff

○  施工监督,确保细节到位

Supervise construction and ensure the details

○  根据具体风格,体现酒店设计精髓

According to the specific style, reflect the essence of the hotel design

8
Exhibition Site Arrangement of Soft Decoration Accessories
软装配饰摆场
○  该区域酒店家具饰品,艺术品到场

Hotel furniture accessories and artworks in the area

○  摆场

Arrangement of exhibition site

○  现场清洁

Cleaning of the site


项目咨询
在线咨询
服务热线
服务热线:15982279206
TOP